MV-LV electrical distribution, preparation of electrical substations, installation and connection of switchboards for the LAF8 line in the PIX1 department
Electrical and instrumentation works for the construction of a new Biojet unit and a third Degumming line at the Gela refinery (CL)
Electrical and instrumentation works for the debottlenecking of the SF5 plant at the Ferrara industrial site
Electromechanical assemblies for the 150 kV Monteferrante electrical substation and sorting cabins (CH)
Electromechanical assemblies for the 150 kV electrical substation in Galatina (LE)
Lighting system installation at the EP Produzione power plant in Ostiglia (MN)
Electrical and instrumentation works and pre-commissioning activities for the upgrade project of the INA-Industrija Nafte refinery in Rijeka (Croatia)
Instrumentation works related to the construction of two new plants to produce polypropylene and polyethylene at the Repsol petrochemical complex in Sines (Portugal)
Electrical and instrumentation erection works for the rationalization of the rubber production chemical plant at the Eni Versalis site in Ravenna
Electrical and instrumentation supplies and assemblies for n. 2 x 90 MWth WTE boilers at Solvay chemical plant in Dombasle-sur-Meurthe (France)
Electrical and instrumentation assemblies for the new paper line at the ICT France plant in Pannes (France)
Electrical and instrumentation erection works for the construction of the new trigeneration system at the Michelin plant in Cuneo
Executive engineering activities, services, supplies and assemblies for the construction of BESS systems at the Enel power plants of Montalto (VT), Pietrafitta (PG) and Santa Barbara (AR)
Engineering, supplies, assemblies and start-up activities for the construction of the electrical substations for the BESS systems of Alessandria 2 HV and Porto Tolle 2 HV limited to medium voltage
Electrical and instrumentation erection works for the construction of a combined cycle gas turbine (CCGT) at the Enel thermoelectric plant in Fusina (VE)
Installation of high-voltage busbar trunking and a lightning protection system at the EP Produzione power plant in Ostiglia (MN)
Electrical and instrumentation assemblies relating to the “New auxiliary boiler” project at the API refinery in Ancona
Electrical and instrumentation works for n. 2 Macchi boilers type MRD 1277-1278 and n. 4 Macchi boilers type Titan M 1279-1280-1281-1282 at the assembly area of Marghera (VE)
Supply and electro-instrumentation assembly of the FGT system at the Acea waste-to-energy plant in Terni
Electrical and instrumentation works for the CAN/AN Prilling tower emission abatement project in Ravenna plant
Supply and installation of MV cables for the power supply of the new Zmill11 rolling mill in the PIX2 department
Electrical and instrumentation assemblies for Albioma biomass boiler at the Le Gol power plant (La Réunion Island – France)
Electrical activities for S7 and T9 finishing lines in the PIX3 department
Electrical works for the construction of a trigeneration system at the production plant of the Fabbrica Italiana Sintetici in Lonigo (VI)
Installation of a 990 kWp rooftop photovoltaic system at the Würth logistics center in Capena (RM)
Installation of a 100 kWp rooftop photovoltaic system at BHS Marconi Airport in Bologna
MV-LV connection activities and design for the Suio hydroelectric plant at Sessa Aurunca (CE)
Electrical and instrumentation maintenance activities at the Eni Research Centers of San Donato Milanese and Novara
Electrical and instrumentation works for n. 2 Macchi boilers type Titan M 1270-1274 and for n. 1 Skid Blow Down 1249 at the assembly area of Marghera (VE)
Electrical activities for the revamping of the AST electrical substation step 2 and step 3 220 kV
Electrical and instrumentation erection works for energy efficiency of the Ponte Malon hydroelectric power plant in Auronzo di Cadore (BL)
Electrical and instrumentation erection works for the new MC42, MC43, MC32 and MC33 Turbogas cycles at the Enel power plant in Montalto di Castro (VT)
Electrical and instrumentation erection works for the conversion to biomethane of the biogas plant at the Codroipo site (UD)
Electrical and instrumentation erection works and commissioning for the construction of a new natural gas boiler at the Enipower petrochemical plant in Ravenna
Electrical and instrumentation supplies and assemblies for the new line 3 of the Steam Generator in Parona (PV)
MCC replacement for Sendzimir 6 rolling mill
Operation & Maintenance service for electrical substations and MV cabins Wind Italia attached to wind farms in the Sardinia area
Civil and electrical works for Battery Energy Storage System (BESS) in Porto Tolle (RO)
Electrical and instrumentation maintenance activities at the Gela refinery (CL)
Electrical and instrumentation assemblies for the construction of the Edison combined cycle thermoelectric plant in Presenzano (CE)
Electrical and instrumentation activities at the SiderAlloys plant in Portovesme-Portoscuso (SU)
Electrical and instrumentation assemblies for the new HRSG boiler – Combined Cycle TL400 – at the Iren Energia thermoelectric plant in Turbigo (MI)
Electrical and instrumentation works for n. 2 Macchi boilers type Titan M 1234-1235 at the assembly area of Marghera (VE)
Electrical and instrumentation assemblies for the renovation of Marghera Levante power plant (VE)
Construction of electrical, mechanical, automation, fire prevention and technological systems for environmental remediation at the Eni Rewind plant in Porto Torres (SS)
Electrical and instrumentation activities for the revamping of n. 2 turbogas FR9 FieldCore plant at Munich (Germany)
Electrical and instrumentation assemblies for the living quarter of the Tyra oil rig in Ravenna
Electrical and instrumentation assemblies for the new Metal Recovery plant at Acciai Speciali Terni
Electrical and instrumentation maintenance activities at the Taranto plant
Electrical maintenance activities on overhead cranes at the Novi Ligure plant (AL)
Electrical and instrumentation maintenance activities at the Genoa plant
Electrical and instrumentation maintenance works planned for the stop at the Versalis plant in Brindisi
Electrical and instrumentation works for n. 2 Macchi boilers type Titan M 1220-1221 at the assembly area of Marghera (VE)
Improvement of safety requirements for pedestrian and vehicular plant entrances at CDF and TUB
Installation of a new LED technology lighting system at the Narni Scalo (TR) plant
Electrical activities and optical fibers for the revamping of new HV protection panels at the AST electrical substation
Electrical installation activities on cabin Metal Recovery
Mechanical and piping erection for water treatment plant, Polyol Project MOL/Thyssenkrupp, Tiszaújváros (Hungary)
Electrical and instrumentation works for n. 3 Macchi boilers type Titan M 1202-1203-1204 at the assembly area of Marghera (VE)
Installation and maintenance activities of charging points for electric vehicles SCIA 1 Rome
Electrical and instrumentation assemblies of the Integrated Compression Units ME01-ME02-ME03 at Würselen (Germany)
Electromechanical and electrical assembly for repowering of the hydroelectric plants of Turbigo Superiore (MI) and Tornavento (VA)
Electrical and instrumentation maintenance works planned for the stop at the Versalis plant in Priolo Gargallo (SR)
Electrical and instrumentation assemblies of an Integrated Compression Unit ME04 at Emsburen (Germany)
Electrical adjustments in ACC and LAC areas
Electrical activities for the construction of the Eni New Energy photovoltaic plant at the Eni site in Porto Torres (SS)
I&E works for the construction of the acid gas treatment plant with LO-CAT technology and interconnecting Green Refinery Project step 2 Venice
I&E installation activities, project LM6000 at Ram Power site in Halle (Germany)
I&E systems for n. 4 Macchi boilers installed at GCGV San Patricio County plant (Texas)
Revamping of electrical, telephone, data transmission, technical gases, air conditioning systems and civil works of the ACC Chemical Laboratory
Wiring and maintenance of data transmission systems at the Thyssenkrupp Acciai Speciali Terni S.p.A. plant
Electrical installation activities for the renewal project of the hydroelectric plants in Volta Mantovana (MN) and Isola Palanzano (PR)
Design, supply, installation, commissioning and maintenance of 10 MV container substations for the Temporary Site Facilities at the MOL/Thyssenkrupp Polyol Project (Tiszaujvaros – Hungary)
I&E installation activities, Eustream unit 1 and unit 2 pumping gas station (Slovakia)
Eni New Energy’s photovoltaic facility electric installation, care of Syndial Assemini (CA)
I&E maintenance activities care of Ferrara industrial site
I&E maintenance activities care of Castelmassa (RO) industrial site
I&E installation activities for revamping Continuous Casting automation system CCO3, care of Thyssenkrupp Acciai Speciali Terni S.p.a.
E&M installation activities for new transformation electricity station, Molinara (BN)
I&E maintenance activities at gas storage stations, San Potito and Cotignola (RA)
Coordination of contractors, works management, electrical planning, technical and functional checks, commissioning of the Cassino (FR) photovoltaic plant
I&E maintenance activities care of Narni Scalo (TR) industrial site
Electrical assemblies remaining new green rubber production chemical plant at TVK petrochemical site in Tiszaújváros (Hungary)
Oleodynamics piping prefabrication activities of the Mose project at San Nicolò (VE)
I&E installation activities project station exspansion ME8 (Germany)
I&E installation activities blooms rolling system at the Iraeta plant, Guipuzcoa (Spain)
I&E installation activities for Albioma biomass boiler (Martinique)
Electrical installation activities on cabin line LAF6 PIX2
Electrical installation activities for new power supply cabin services at Linde Gas
Completion of the electric installation in the new green syntethic rubber (SSBR-1) at Mol Petrolkemia plant, Tiszaujvaros (Hungary)
Civil and electrical maintenance activities of photovoltaic systems located in the Sardinia region
Construction of a DMV hydroelectric plant with EPCC formula at the Pontecosi (LU) dam
Supply of components and systems for adaptation to DPR 151/11 at Soverzene (BL) hydroelectric plant
Supply of components and systems for adaptation to DPR 151/11 at Arsiè, La Stanga, Agordo, Malga Ciapela e Gardona (BL) hydroelectric plants
I&E maintenance activities at Ferrara’s petrolchemical site
I&E maintenance activities at Porto Torres’s petrolchemical site
Lavori elettrostrumentali fase 2 POT e Interconnecting Progetto Green Refinery Venezia
I&E installation activities and dismantling activities on nr.14 extraordinary modules of the substation 51 for General Electric Grid Solutions S.p.A., Ravenna (RA)
Electric revamping new Bertolotti ACC system
Replacement of the MCC panel in the Thermal Plant